Add a sequence element using the Equipment Sequence Element toolbar
Add disconnected sequence elements to the
Equipment Sequence
diagram. Note that when selecting a transition, and adding a Step and Transition pair, it is automatically inserted below the selected transition.- Click the Sequence Editor workspace.
- On theEquipment SequenceElementtoolbar, click the button for the element to add.
Provide Feedback