Run a trend
To be able to run the current trend the workstation must be online to the controller, with the chart open, and have at least one tag configured.
When a trend is started, all existing trend data is permanently deleted.
To run a trend:
- Select theRunbutton on theTrend Controlbar.
Provide Feedback