- Studio 5000 Logix Designer
- Tasks, programs, and routines
- Add-On Instructions
- Controller Organizer
- Logical Organizer
- Alarms
- Tag-based alarms
- Tag Editor and Data Monitor
- Configure settings for Tag Editor and Data Monitor
- Equipment phases
- Equipment Sequences
- Equipment Sequence Diagrams
- Ladder Editor
- Structured Text Editor
- Sequential Function Chart Editor
- Define the steps of an SFC process
- PlantPAx instruction properties
- Controller Properties
- Editing Controller Properties
- Controller Security
- Source Protection
- License Source Protection for Routines and Add-On Instructions
- Module Information
- 1756 ControlLogix I/O Modules
- Instruction Set
Cannot Reschedule Existing Program or Equipment Phase (Online)
The program (or Equipment Phase) being imported already exists in the project, and is scheduled in a different location (task, unscheduled programs or phases, Controller Fault Handler, Power-Up Handler).
Programs and Equipment Phases cannot be rescheduled through import while online in run mode.
Proceed with the import, the Schedule In setting changes to the existing location and is unchangeable.
Use the option of changing the Final Name to create a new program or Equipment Phase, and then changing the Schedule In setting to the desired location.
Provide Feedback