- Studio 5000 Logix Designer
- Tasks, programs, and routines
- Add-On Instructions
- Controller Organizer
- Logical Organizer
- Alarms
- Tag-based alarms
- Tag Editor and Data Monitor
- Configure settings for Tag Editor and Data Monitor
- Equipment phases
- Equipment Sequences
- Equipment Sequence Diagrams
- Ladder Editor
- Structured Text Editor
- Sequential Function Chart Editor
- Define the steps of an SFC process
- PlantPAx instruction properties
- Controller Properties
- Editing Controller Properties
- Controller Security
- Source Protection
- License Source Protection for Routines and Add-On Instructions
- Module Information
- 1756 ControlLogix I/O Modules
- Instruction Set
Tasks, programs, and routines
A project file contains the building blocks of the control system.
Tasks are the basic scheduling mechanism for executing a program. The default configuration contains a continuous task, called Main Task.
The Main Task contains a program called Main Program.
The Main Program contains a routine called Main Routine, which is configured as the main routine.
The system executes the task, programs, and routines defined in the project from beginning to end.
Provide Feedback