Synchronize the imported nodes at design time
Synchronize the already imported nodes.
Prerequisites
- To synchronize the imported nodes at design time
- InProject view, double-click an OPC UA client.
- In the editor, selectRefresh.
- Select the nodes to synchronize and selectApply.
synchronize
Provide Feedback