Construct an Equipment Sequence diagram with a selective topology

In this example, construct an
Equipment Sequence
diagram that uses a selective topology.
  • Go offline with the controller.
  • Create any
    Equipment Phase
    s needed for the
    Equipment Sequence
    .
  • Define a new
    Equipment Sequence
    .
  • Configure the
    Equipment Sequence
    properties.
To construct a selective topology
Equipment Sequence
diagram:
  1. Select the Sequence Editor workspace.
  2. On the
    Equipment Sequence
    Elemen
    t toolbar, select
    Add Step and Transition Pair
    Step and Transition Pair.
  3. Select the connector of the first element to create a link, and then select the connector of the second element to attach the link.
    TIP: When selecting the initial step link before adding the step and transition pair, the link automatically connects to the pair.
  4. Continue to
    Add Step and Transition Pair
    elements as needed.
  5. Assign a name and a phase to each step
  6. Create transition expressions between each step
  7. On the
    Equipment Sequence
    Element toolbar, select
    Add Selective Divergence
    .
  8. Connect the divergence to a preceding step.
  9. Add execution paths to the divergence:
    • Add and connect a transition to the divergence to create a separate execution path.
    • Repeat to create additional execution paths as needed.
  10. Continue adding steps and transitions as needed.
  11. Connect to the end step Terminal Step.
  12. Verify the routine:
    1. On the Standard toolbar select L5K_VerifyRoutineButton.
    2. Errors are listed in the Output window on the
      Errors
      tab at the bottom of the application.
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.