Verify OSI PI Server Connection
- Once the OSI PI server and InfoPlatform service are installed successfully.
- Create new tag in OSI PI server through PI System management tool.Point Builder - PI System Management Tool
- Insert some value in respective tag in OSI PI server.Archive Editor - PI System Management Tool
- Check through API whether this tag is coming under respective server.Verify API - New Tag
- Verify in FTADataView application through InfoPlatform connector.
- Log in to DataView application, under the Connection tab, click [Add Connections].
- Select [FactoryTalk Service] under the Rockwell Automation drop-down list.
- Provide the parameters and click [Test Connection]. If all the details are valid, the “Test connection successful” message displays..
- Drag and drop the OSI PI server tag and configure with start date time, end date time, and aggregation.Verify FTADataView - New Tag
- Click [Next] to view Preview Data Page.Preview Data Page(OR) Verify existing tag (while installing OSI PI server) present in OSI PI server through InfoPlatform connector like below.
- Drag and drop the OSI PI server tag and configure with start date time, end date time, and aggregation. Click [Next].Verify FTADataView - New Tag
- Click [Next]. The Modify Entities Page displays.Modify Entities Page
- The Preview Data page displays. Click [Next].Preview Data Page
- The OSI PI server Storyboard displays.OSI PI server Storyboard
Provide Feedback