Verify OSI PI Server Connection

Verify OSI PI Server Connection

  1. Once the OSI PI server and InfoPlatform service are installed successfully.
  2. Create new tag in OSI PI server through PI System management tool.
    Point Builder - PI System Management Tool
  3. Insert some value in respective tag in OSI PI server.
    Archive Editor - PI System Management Tool
  4. Check through API whether this tag is coming under respective server.
    Verify API - New Tag
  5. Verify in FTADataView application through InfoPlatform connector.
  6. Log in to DataView application, under the Connection tab, click [Add Connections].
  7. Select [FactoryTalk Service] under the Rockwell Automation drop-down list.
  8. Provide the parameters and click [Test Connection]. If all the details are valid, the “
    Test connection successful
    ” message displays..
  9. Drag and drop the OSI PI server tag and configure with start date time, end date time, and aggregation.
    Verify FTADataView - New Tag
  10. Click [Next] to view Preview Data Page.
    Preview Data Page
    (OR) Verify existing tag (while installing OSI PI server) present in OSI PI server through InfoPlatform connector like below.
  11. Drag and drop the OSI PI server tag and configure with start date time, end date time, and aggregation. Click [Next].
    Verify FTADataView - New Tag
  12. Click [Next]. The Modify Entities Page displays.
    Modify Entities Page
  13. The Preview Data page displays. Click [Next].
    Preview Data Page
  14. The OSI PI server Storyboard displays.
    OSI PI server Storyboard
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal