- Studio 5000 Logix Designer
- Tasks, programs, and routines
- Add-On Instructions
- Controller Organizer
- Logical Organizer
- Alarms
- Tag-based alarms
- Tag Editor and Data Monitor
- Configure settings for Tag Editor and Data Monitor
- Equipment phases
- Equipment Sequences
- Equipment Sequence Diagrams
- Ladder Editor
- Structured Text Editor
- Sequential Function Chart Editor
- Define the steps of an SFC process
- PlantPAx instruction properties
- Controller Properties
- Editing Controller Properties
- Controller Security
- Source Protection
- License Source Protection for Routines and Add-On Instructions
- Module Information
- 1756 ControlLogix I/O Modules
- Instruction Set
Commanding and Running Equipment Sequences
The right to command an Equipment Sequence or an Equipment Phase is granted through ownership.
Both
Equipment Sequence
s and Equipment Phase
s must be owned to be commanded. The ownership commands are
Attach (SATT) and Detach (SDET).Internal sequencers (programs), external sequencers (
FactoryTalk Batch
), and operators always use
an Attach instruction to command an Equipment Sequence
. Logix Designer
always uses an
Override instruction to command an Equipment Sequence
. A program might successfully attach an
Equipment Sequence
but be unable to command it because Logix Designer
has overridden ownership.Once ownership is taken, steps and transitions can be commanded and
Equipment Sequence
s can be controlled.Provide Feedback