Work Units Level Dashboard

You can view energy consumption and emissions charts of all Work units types based on your time period selected from the date picker.
Perform the following steps to view, show/hide, and filter charts:
  1. Click the [] icon from the menu bar and select
    Work units
    from the hierarchy list.
    The following table provides the list of charts available by default in the dashboard:
    Chart Types
    S.No
    Chart Name
    Description
    1
    Total electricity consumption widget (Harmonized)
    This shows the overall electricity consumption.
    2
    Electricity consumption chart
    You can view the selected time period with the respective granularity on the X-axis and consumption on the Y-axis. This chart shows the overall electricity consumption summary.
    3
    Total natural gas consumption widget (Harmonized)
    This shows the overall natural gas consumption.
    4
    Natural gas consumption chart
    You can view the selected time period with the respective granularity on the X-axis and natural gas consumption details on the Y-axis. This chart shows the overall natural gas consumption.
    5
    Total energy intensity widget (Harmonized)
    This shows the overall energy intensity summary.
    6
    Energy intensity chart
    You can view the selected time period with the respective granularity on the X-axis and energy intensity on the primary Y-axis, production data on the secondary Y-axis. This chart shows the overall energy intensity summary with the comparison of production data.
    7
    Total cost widget (Harmonized)
    This is the overall summary of the total resource cost.
    8
    Cost chart
    You can view the selected time period with the respective granularity on the X-axis and cost on the Y-axis. This chart shows the overall energy cost summary.
    9
    Electricity demand summary widget (Harmonized)
    This shows the overall electricity demand.
    10
    Electricity demand chart
    You can view the selected time period with the respective granularity on the X-axis and electricity demand details on the Y-axis. This chart shows the overall electricity demand.
    11
    Natural gas demand summary widget (Harmonized)
    This shows the overall natural gas demand.
    12
    Natural gas demand chart
    You can view the selected time period with the respective granularity on the X-axis and natural gas demand details on the Y-axis. This chart shows the overall natural gas demand.
    13
    Total energy consumption widget (Harmonized)
    This shows the overall energy consumption.
    14
    Energy consumption - Heat map
    The X-axis and Y-axis granularity values representation based on your time period selection. This chart shows the overall consumption summary in the heat map format with color representation.
    15
    Total emission widget (Harmonized)
    This is the overall summary of resource emissions.
    16
    Emission chart
    You can view the selected time period with the respective granularity on the X-axis and emission on the Y-axis. This chart shows the overall emission summary.
  2. To see the data, hover over the bar in the required chart.
    NOTE:
    Click the [] icon to view the chart in the widget view. Click the [] to switch the view from widget to chart.
  3. To remove the chart from the dashboard, click the [] icon from the respective chart.
  4. In the
    Delete chart
    dialog, click [Delete].
    Delete chart dialog
    The "
    Chart remove successfully
    " message displays.
  5. To add or show the chart in the dashboard, click the [] icon from the top-right corner of the Work units dashboard.
  6. Select the required chart check box to add to the dashboard and click [Save].
    Work units Dashboard chart settings
    NOTE: To remove the chart from the dashboard, uncheck the required chart check box and click [Save].
    The “
    Dashboard setting changes updated successfully
    ” message displays.
Perform the following steps to change the chart time period:
  1. Click the [] icon.
  2. Select the
    Date
    or
    Week
    or
    Month
    or
    Year
    , or
    Custom
    from the drop-down list and the calendar displays.
  3. Select the time period.
  4. Click the [] and [] to move forward and backward period of the selected time period respectively.
    NOTE: If you select
    Custom
    from the drop-down list, you need to select the
    From
    and
    To
    date and provide the time manually.