Add Work Units
After adding the Work center or Area, you can add the Work units.
NOTE:
The following points are required to view data on
Work units level dashboard
:- Data from different meters which are directly connected to a Work Units node will be considered for the data aggregation.
- For consumption and demand charts, the respective resource meter has to be configured with the proper tag mapping.
- For Cost charts, the respective rate schedule should be configured at the Site level.
- For Emission, the respective emission factor should be configured at the Site level.
- For Production and energy intensity charts should have correct tag mapping for production count measurement.
- Harmonized units are defined at the Enterprise level and will be used to display harmonized consumption, intensity, or emissions data.
Perform the following steps to add Work units:
- Select theAreaorWork centerand the [] icon appears.
- Click the [] icon and select [Add].
- In theAdd Componentdialog, select [Work units] underNodefrom the left pane and set these parameters:
- Type: Select the Work units type from the drop-down list.
- Name: Provide the Work units name.
- Description: Provide the description of the Work units.
- Click [Add].
The "
Work units added under Work center successfully
" message displays.Related Information