Process Value Meter Tag Mapping
After adding the Process value meter to the hierarchy list, perform the following steps for tag mapping:
- Select the Process value meter from the hierarchy list and select theTag maptab.
- Click [Add Tag].
- In theTag Mapdialog, select the necessary data set from theData setdrop-down list.NOTE: The data set is a container for data objects with metadata about the data it contains.
- (Optional) Filter the tag name by providing the keyword.
- Select the relevant tag name check box from the table and click [Map Tags].
- You can select mapped and unmapped tags for tag mapping. If you select mapped tags, an alert message will appear, providing instructions to confirm the remapping. Click on the [] icon to remove tags that are not required to remap.NOTE: Data is not modified or deleted during remapping.
- To continue with remap, click [Confirm].
- In theTag mapdialog, clickMap Tags.The "Selected tags are mapped to the Process value meter successfully" message displays.NOTE:Once the tag is mapped, make sure to update the mandatory fields (MeasurementandUnit) by following the steps 9-11. Failing to do so will cause errors in the dashboard charts.
- Click the [] icon beside the tag name and theEdit Tagdialog is displayed.
- Provide theMeasurementandUnitdetails and click [Save].
- The "Tag changes updated successfully" message displays.
- To remove tags, select the required tag check box from theTag Maptable.
- Click [Remove].
- In theRemove Tagsdialog, click [Delete].The "Tag removed successfully" message displays.
Related Information
Provide Feedback