- Getting started
- Creating projects
- Graphic objects
- Predefined graphic objects
- Object and variable references
- Extending projects
- NetLogic
- Tutorials
- Dynamic links tutorial
- Graphic objects tutorial
- NetLogic tutorial
- OPC UA tutorial
Synchronize the imported nodes at design time
Synchronize the already imported nodes.
Prerequisites
- To synchronize the imported nodes at design time
- InProject view, double-click an OPC UA client.
- In the editor, selectRefresh.
- Select the nodes to synchronize and selectApply.
synchronize
Provide Feedback